Home

About

Admissions

Departments

Campus Life

Placements

Exam Cell

Facilities

Search

 
 

Summary on industrial visits in A.Y 2023-2024

S.NO

NAME OF VISIT

YEAR OF STUDETNS

DATE

No of Students

1

Polavaram Coffer Dam

III/IV

28-12-2023

23

2

Steel Plant, Vizag

III/IV

27-12-2023

23

3

Krishna river flood protection wall, vijayawada

III/IV

06-10-2023

41

4

Modulo Ceramic PVT.LTD, krishnaropalem Vaddeswaram

III/IV

12-10-2023

34

Summary on industrial visits in A.Y 2022-2023

S.NO

NAME OF VISIT

YEAR OF STUDENTS

DATE

No of Students

1

Tungabadra dam, Hampi

III/IV

14/02/2023 to 17/02/2023

59

2

Steel Plant, Vizag

IV/IV

06/03/2023 to 09/03/2023

49

3

Water Treatment Plant, Takkellapadu

II/IV

10-02-2023

54

4

Ultra Tech Batching Plant, Vaddeswaram

II/IV

04-11-2022

88

5

Kavuri hills, Mangalagiri

IV/IV

21-10-2022

77

6

Building Material Expo, Guntur

III/IV

14-10-2022

55

7

Cold Storage, Prattipadu

IV/IV

14-10-2022

50


Academic Year 2020-21

S.NO

NAME OF COMPANY

VISITED SECTOR

YEAR OF STUDETNS

DATE

NO Of Students

1

ONGC, Ngayalanka

GGS sector

IV/IV

03-03-2022

45


Academic Year 2019-20

S.NO

NAME OF COMPANY

VISITED SECTOR

YEAR OF STUDETNS

DATE

No Of Students

1

Undavalli Constructions, Kaza

Multi Story Buildings and Dewatering Problems

IV/IV

10-07-2019

56

2

Government of A.P,Takkellapadu.

Water treatment plant

III/IV

31-01-2020

75

3

Soma Enterprises Ltd

Kanaka Durga Fly Over

IV/IV

12-02-2020

65


Academic Year 2018-19

COMPANY NAME

COMPANY SECTOR

TARGET STUDENTS

DATE OF VISIT

NO.OF STUDENTS

FACULTY COORDINATOR

Polavaram

Spillway, ECRF Dam, coffer dam pattiseema pump house

II

14-02-2019

93

Mr.D.Aditya Sai Ram,

Mrs. K. Sai Ramya

Mr. K. Nikhil Vamsi

Mr. Noor Ibrahim

Amaravathi Captial region

Construction of building in Capital region including secratarite and high court

III & II

07-02-2019

75

Mr.D.Aditya Sai Ram,

Mr. Ch. Venu Kirshore

Ms.K.Krishna Veni

Ultra Tech Rmc Plant

Batching

II/IV

7-09-2018

46

Mr. Ch.Sukesh,

Mr.A.Srikanth

Ms.K.A.Nandini

Soma Enterprises Ltd

Kanaka Durga Fly Over

IV/IV

3-8-2018

63

Mr. Ch.Sukesh

Mr Y.SubbaReddy

Dilip Build Constructions,Vijayawada

Machilipatnam Fly Over

IV/IV

28-7-2018

77

Mr. Ch.Sukesh

Mr Y.SubbaReddy

Mr.D.Aditya Sairam.

 
 

Route Map

Address and Phone

Vasireddy Venkatadri Institute of Technology
Nambur (V)
Peda Kakani (Md)
Guntur (Dt)
Andhra Pradesh
522508 

 
9951 023 336
9849 542 336
 
email
situs toto pucuk4d indobet situs toto toto slot toto slot toto slot depo 10k istanaslot istanaslot istanaslot 8kuda4d judi bola toto toto toto situs toto toto link slot slot toto bobatoto daftar togel online logototo situs toto situs toto toto link togel bydplay patentoto Login situs toto Slot 4D situs toto leon188 situs toto slot gacor situs toto situs toto situs toto ilmutoto mix parlay mawar800 resmi ilmutoto joker11 toto slot patentoto lingkartoto TOTO SLOT ilmutoto pascol4d resmi raja slot panen100 semibola https://asupantoto.co/ kumontoto login mso303 pompa4d https://nolimithoki.dev/ pucuk4d https://asupantoto.co/ ini777 slot pascol4d sbobet88 sbobet88 slot gacor nenek188 dinasti33 winsortoto winsortoto https://www.juara288.asia/ slot88 https://shopjoliboutique.com/ slot jepang pucuk4d slot depo 5k kari4d https://kelurahangadul.purbalinggakab.go.id/profil-kelurahan/ RP888 toto toto gigaroyal DANGDUT 4D pascol4d kari4d flokitoto slot gacor slot depo 5k petir135 login bobatoto bobatoto bobatoto sontogel PASCOL4D mpo slot toto slot situs slot toto pakde4d link slot bobatoto popotogel login TotalSportek nobu99 toto logototo toto AMANAHTOTO istanaslot sumbartoto mataramtoto sumbartoto rp888 meteorbet88 pajaktoto AMANAHTOTO pascol4d slot gacor situs toto slot gacor situs toto toto slot gacor hari ini slot gacor hari ini link slot gacor hari ini slot gacor hari ini link slot gacor slot online slot gacor slot gacor https://myslot188.monster/ https://slotpoker188.world/ toto slot slot gacor toto slot slot gacor malam ini slot resmi toto 4D slot gacor